5800 Master Plan

Jerusalem Metropolis Master Plan Map

Draft - Jerusalem Master Plan Concepts

Timeline for development

2010-2020

  1. Increase in private investment and construction of multiple hotel/residential
  2. Approval of traffic infrastructure from outer ring attractions to center of the metropolis.
  3. Infrastructure development of outer ring attractions
  4. Approval of above/underground traffic systems and services to the Old City.
  5. Design and approval of arterial ring roads for Jerusalem metropolis

2020-2030

  1. Construction of hotel projects along approved routes
  2. Infrastructure development for leisure and spa / resort hotels on the Dead Sea.
  3. Development of multiple outer ring attractions
  4. Underground traffic exchange infrastructure for peripheral centers around the historic basin.

2030-2040

  1. Construction of traffic system a) Eastern International Airport to the main city traffic system b) East-West of the Metropolis (roads and trains); from Tel Aviv to Amman.
  2. Construction of underground (Metro) system in Jerusalem.
  3. Connection of Jerusalem Metropolis to National/International train lines North-South; Jerusalem-Hevron-Beer Sheva and Jerusalem- Shchem Afula.
  4. Connection of Jerusalem Metropolis to National/International train line in the Jordan Valley, Beit Shean – Dead Sea – Eilat.